Industries / Manufacturing & Industrial
Crush peak demand
Crush peak demand
charges.
Reduce OPEX and gain energy independence with tailored BESS architecture.
The Energy Challenge
Heavy machinery creates sharp, punitive peaks in your load profile. Time-of-day tariffs mean you pay absolute maximums during evening production shifts.
How WattSpace Helps
Specialized Solutions
Peak Shaving
Optimizing discharge strategies to counter specific tariff structures and operational patterns.
Max Demand Reduction
Seamlessly integrating solar and storage to bypass local grid constraints and maximize self-consumption.
Power Quality Control
Ensuring high-reliability power quality and seamless DG set coordination during grid outages.
AEO Standard
Frequently Asked Questions
How does peak shaving reduce my manufacturing energy bill?
By discharging the BESS during the most expensive Time-of-Day (ToD) tariff windows, you avoid drawing premium-priced grid power, directly reducing your OPEX.
Can BESS handle the inrush current of heavy machinery?
Yes, modern industrial BESS can provide instantaneous high-power discharge to buffer the grid from the sharp transients caused by motors and heavy equipment.
What is the ROI for an industrial BESS installation?
Typically, depending on the ToD tariff spread and peak demand penalties, ROI ranges between 3 to 5 years for heavy manufacturing facilities.
Do we need to halt production for the installation?
No. The system is installed in parallel and cut-over is planned during scheduled maintenance windows, ensuring zero unplanned downtime.
Can BESS handle the inrush current of heavy machinery?
Yes, modern industrial BESS can provide instantaneous high-power discharge to buffer the grid from the sharp transients caused by motors and heavy equipment.
Ready to optimize your Manufacturing & Industrial energy?
Get a free feasibility study customized for your load profile and operational requirements.